G-TDEKZFQZ7J

2No 18m high portal frames provided the lateral stability to the existing structure and steelwork member sizes were limited to ensure maximum floor space. Welded beam to column stiffened connections and HSFG floor beam splice connections were used to ensure the applied loads could be transferred through the portalised joints.

Gallery